Routine work day today and much achieved. Our volunteer sparkie ran a new 6.0mm sub-main direct from the Engine room switchboard to the boiler, providing increased electrical quality and security. Also general lighting fixtures containing PCB's were removed and/or replaced. Our volunteer electronics guru cleaned, adjusted and recorded the boiler no-flame photocell circuit. Our (fast becoming) expert pipework volunteer, re-ran boiler drain pipework, while others made various temporary fixes permanent, and nozzle research continued. A test run indicated that while we are on the right track, and operational, more boiler control tweaking will probably be required.
On the outside, a couple of survey students took positional readings on the chimney, and we look forward to hearing the results.